CDED Special Provisions: Rev. Number 122


REVISION INFORMATION SHEET
Ronen House
April 2004


NAME OF PUBLICATION: Contract Design Estimating and Documentation (CDED) Manual, Volume I and II

ATTACHMENTS: Revision 122


Please update your manual according to the following. Revised and new texts are attached for insertion as required.

SSP CODE
EXISTING
VERSION
DATE
NEW
VERSION
DATE
CPS
IMPLEMENTATION
DATE
REMARKS
CDED Volume II- Chapt. E
MTO General Conditions of Contract
April 2003
April 2004
April 21, 2004
Revised:
- Paragraphs 01) and 02) of GC1.04 removed and added to SP100S02.
- Replaced the content of GC8.02.06 with the content from SP100S50.
100S01
100F03
100S07
100F21
100S22
100F28
100F31
100S48
100S49
April 2003
April 2004
April 21, 2004
Revised. Reference to MTO General Conditions of Contract, April 2003 changed to April 2004.
100S02
July 2003
April 2004
April 21, 2004
Revised. All exceptions to Ontario Provincial Standards have been removed from the MTO General Conditions and added to the SSP.
- Title changed.
- Added OPS Material Specifications 1202, 1203 and 1210 to paragraph 6).
100F36
April 2003
April 2004
April 21, 2004
Revised: Reference to MTO General Conditions of Contract, April 2003 changed to April 2004.
- Clause 3.3.2 reference to OPSS 928 in Structural Items removed and replaced with SSP 109S49 and reference to SSP 930S06 changed to 109S50.
100S50
April 2003
N/A
April 21, 2004
Cancelled. Included in the MTO General Conditions of Contract, April 2004 as GC8.02.06.
102S06
December 1997
N/A
April 21, 2004
Cancelled. Content added to SSP 206S03.
102S08
November 1998
N/A
April 21, 2004
Cancelled. Content added to SSP 206S03.
109F10
March 2001
March 2004
April 21, 2004
Revised. Reference to hard copy version of Foundation Reports removed as they are now being provided via Electronic Bidding System.
109S33
August 1995
N/A
April 21, 2004
Cancelled. Contents of SSP addressed in SP109S49.
109S49
N/A
March 2004
April 21, 2004
New. Deletes and replaces OPSS 928 in its entirety. Addresses the contents of SSP’s 109S33 and 928S02.
109S50
N/A
March 2004
April 21, 2004
New/Revised. SSP930S06 renumbered to reflect the fact that this SP is general in nature and not item specific.

Revisions include:
- Time lines for submissions have been reduced.
- Cold weather requirements have been included in this SSP instead of referencing OPSS 904.
- Added option for Contractor to use Proprietary Products for small concrete repairs (greatest dimension less than 300 mm).
- SSP looks at individual structures instead of grouping structures together when determining whether or not testing is required.
- The remedial work in Table 4, Treatment of Cracks, has been revised.
- The equation for calculating payment reduction has been cleaned up.
- Acceptance criteria for tensile bond strength has been increased.
- Penalty for tensile bond strength has been increased. Full penalty will be incorporated over a period of three construction seasons.
110F13
March 2003
March 2004
April 21, 2004
Revised. Version date for OPSS 1010 changed from March 1993 to November 2003 where applicable.
206S01
November 1997
N/A
April 21, 2004
Cancelled. Content added to SSP 206S03.
206S03
N/A
January 2004
April 21, 2004
New. Deletes and replaces OPSS 206 in its entirety.
- Incorporates content from SSP’s 102S08, 102S06 and 206S01.
- Rock Embankment item added to SSP.
330S01
January 1996
April 2004
April 21, 2004
Revised. Reference to OPS General Conditions of Contract, August 1990 in section 330.10 changed to MTO General Conditions of Contract.
928S02
October 1999
N/A
April 21, 2004
Cancelled. Contents of SSP addressed in SSP109S49.
930S06
August 2000
N/A
April 21, 2004
Cancelled. Replaced by 109S50. See above.